As the project reaches the home straight, the final element is taking shape: the new pavilion.
The pavilion is the centrepiece of the project. It looks out over the Master’s Field (the College’s sportsground) with accommodation blocks on either side: seen from the field in the photo above, graduate blocks on the left and undergraduate on the right, with some accommodation for Fellows in both groups.
The accommodation blocks are largely finished, but snagging and finishing touches of the Phase 2 buildings continue – railings, planting, bike racks, car parking, signage, entrance ways, paving, garden walls, and so on. Handover of these to the College is imminent. Then the rooms in the new blocks will be furnished over the summer, ready to be occupied in the autumn.
The pavilion will serve many functions. It has a main hall for dining, events and watching sport, complete with kitchen and servery. Above the hall is a glazed clerestory, which lets light into the hall below. A pergola extends around the perimeter of the building to provide screening from the sun for outdoor seating. In the basement of the pavilion there is a squash court and changing rooms, as well as the ‘engine room’ for the whole site.
Photos below by Nicola Trott and Richard Norman. To see captions, hover your mouse over the images.





